Renewal of control panel manufactured by Lesters of Croydon to include a full require, new shaft equipment including tape head and shaft switches.
Replacement of lift car/ sling/ doors, all landing entrances, control panel and switch gear and complete re-wire. New hoisting machine and A3 compliant system to prevent uncontrolled movement.
Refurbishment of 6 floor lift in residential building.
The existing lifts had manual gates on all floors and in the lift car.
We replaced these with fully automatic doors and modified the control system to suit.
We also carried out a full refurbishment of the lift car interior.
Refurbishment of 3 lifts to Allianz consultant specification to include, installation of Control panel and lift position system supplied by DAC and complete rewire to suit including new trailing cables. New push buttons and position indicators. Total replacement of safety gear and over speed governor with bi-direction system supplied by Atwell and to prevent uncontrolled movement (A3) In the unlikely event of the lift brake failing.
Partial refurbishment of Lift interior to include a new ceiling/ LED lighting, new COP and replacement floor covering with protective drapes supplied to prevent damage to the walls and mirror.
New control panel and associated equipment manufactured by Lester controls of Croydon including all new push buttons and complete rewire.
New hydraulic valve block, oil change and ram seals and full test carried out.
Lift interior refurbishment including new ceiling and LED downlighters, new side and rear wall panels, new COP and buttons and new rubber studded floor covering.
Copyright © 2022 Liftwell southern (lifts) Ltd - All Rights Reserved.
Powered by GoDaddy